Saturday, January 30, 2010

Concrete and First Floor Framing

Footings and basement walls poured.


Basement walls are braced for back-filling of dirt around outside of basement walls.
Drain pipes laid. Notice the fashionable high-waters.
Concrete slab in basement being poured. A few floor joists laid in advance of the final concrete work.
First floor exterior walls being framed.
Interior walls being framed out on first floor. The opening on the left is the front door. The opening on the right is a set of triple windows to the dining room.